Stagecoach Electric Co.
⚡ Lead to Load — private access
Stagecoach Lead to Load Project: - none -

Projects

Create a project, fill in details, design it, then generate a proposal & contract. Everything saves in this browser.

Project details

Customer and site info. Used across the map, quote, and proposal.
When on, the Quote / BOM adds a Subcontractor Pricing section priced from your subcontractor rate sheet, and the customer price shows the Subcontractor total.
📤 Drag & drop files here, or click to browse

Energy Usage

Upload the customer's Green Button Data (CSV) or enter monthly usage by hand. Set their current rate plan and the plan they'll move to after solar.
📤 Drag & drop PDFs or photos here, or click to browse
ADU / second meter- upload a separate bill or Green Button CSV; the ADU is sized as its own system.
📤 Drag & drop the ADU bill here, or click to browse
⚡ Claude helper
Pick a utility & rate and enter usage - I'll estimate the bill and suggest a system size here.
Bill is estimated from a blended $/kWh for the selected rate (TOU prices vary by time of use, so treat it as a ballpark). Type a value to lock it manually.

Design / Map

Pick a module first, then drag across the roof to lay a grid of panels. Click any panel to delete it.
0.00 kW
0 panels
Pick a solar module above to begin placing panels.
Equipment icons- drag onto the map

Off-Grid / Battery Sizing

Enter daily loads, autonomy and site sun-hours to size the battery bank and array.
LoadWattsQtyHrs/dayWh/day

Dwelling Load Calculation - NEC Standard Method (Art. 220 Pt III)

Single-family standard-method estimate for service sizing. Always verify against the current NEC & your AHJ.

Appliances & loads (VA)

Equipment & Bill of Materials

Search your catalog, set quantities. Costs are your supplier price; markup is applied for the customer price.
⚡ Build the materials list with Claude
Claude reads your Details, Usage, Recommended system, Design/Map and your whole catalog. Add extra notes (conduit runs with distances, wire sizes, breakers), or just click here and press Enter to build from the project as-is.

Bill of materials

ItemCost eaQtyExt cost

Labor

Adders (MSP upgrade, circuit relocation, etc.)

Pricing

Contract details (Solar / ESS)

These fill the Home Improvement Agreement. Total cost pulls from your Quote unless you enter an override. Equipment auto-fills from this project's design & BOM - if there's no battery, the ESS section is left out entirely.

Generate documents

Preview, then use Print → Save as PDF. For solar jobs, the CA Guide must be signed before the contract.
Templates for convenience - have an attorney review before use, and confirm the CA guide is the current CPUC version.

⚡ Tailor with Claude - this project only

Generate a document above first, then ask Claude to change any part of it - scope, wording, terms, pricing text, add sections, anything. It edits the document currently shown. You can also edit the document directly by hand (click into it). Examples: "Add a 200A main panel upgrade and 40 ft of trenching to the scope." · "Change the payback to 6 years." · "Remove the sentence about pre-existing roof conditions." · "Add a section on the reroof coordination."

Company & defaults

Contract defaults

Boilerplate used by the contract generator.

Post-solar bill model

Assumptions behind the estimated post-solar bill & savings. Tune to match your market / OpenSolar. Note: OpenSolar runs a full hour-by-hour TOU simulation - this is a simplified annual model, so treat it as a ballpark.

Map imagery

Default is free Esri imagery. For sharper HD aerials, paste a free Mapbox access token - sign up at mapbox.com, and copy the default public token (starts with pk.) from your account page. After saving, reload the tool, then use the layer switcher (top-right of the map) to pick "Mapbox Satellite (HD)". For OpenSolar-grade clarity you'd need paid Google/Nearmap imagery.
Google Satellite is the sharpest (closest to OpenSolar) and is effectively free at your volume (10,000 map loads/mo free). After saving a key, reload the tool - Google Satellite becomes the default and also appears in the map's layer switcher.

Claude AI assist (optional)

Paste an Anthropic API key to enable the AI panel. It reads the current project to draft scopes, proposals, and answer questions. Key is stored only in this browser.
Security: keep this file on your computer. Don't upload it or the browser data anywhere with the key inside.

Cloud sync (Google Drive)

Keep every project auto-saved to your Google Drive so nothing is tied to one device. Sign in once; changes then save to the cloud automatically and load on any device you sign into. Works on the live site, not the local file preview.
One-time setup (no credit card): create a free Google Cloud project and an OAuth Client ID. The app only touches the single data file it creates in your Drive.

Catalog

Seeded from your Greentech pricing. Add/edit items; prices are your cost.
BrandNameCatCost
⚡ Claude Assist
Hi Derek - add an Anthropic API key in Settings and I'll help draft scopes, size systems, and write proposals from the open project.
Conduit, Fittings & Wire- CED / your price sheet
Basic Contract - Project Specifics
Describe this job in your own words - scope, quantities, payment terms, and any special conditions. Claude will turn it into a clean Scope of Work for the General document. You can also use for section headers and for bullets.